Install new gas line to the fireplace box from basement gas line including shut off valve on firebox (Must have sufficient gas supply within 15 ft of fireplace box)
Assemble, install and connect new gas log unit to new gas line
Test to ensure proper operation
Job site cleanup and walk-through inspection
One-year labor warranty
Options:
Job Description Includes:
Install new gas line to the fireplace box from basement gas line including shut off valve on firebox (Must have sufficient gas supply within 15 ft of fireplace box)
Assemble, install and connect new gas log unit to new gas line
Test to ensure proper operation
Job site cleanup and walk-through inspection
One-year labor warranty
Job Description Includes:
Install new gas line to the fireplace box from basement gas line including shut off valve on firebox (Must have sufficient gas supply within 15 ft of fireplace box)
Assemble, install and connect new gas log unit to new gas line
Test to ensure proper operation
Job site cleanup and walk-through inspection
One-year labor warranty
Total Price:
$513.33 USD
Approximate Completion Time: 6:25 Hours
Fireplace gas Log (New installation)
Customer to Supply: Fireplace gas log unit
$513.33 USD
Selected Options
Customer To Supply:Read More
Add Comment
We can match you with pros for this job
Let us introduce you to some great pros we know
Fixed
Hourly Rates
Live Online
Scheduling
100%
Satisfaction Guarantee
Subscribe to our Newsletter
We're here to help. Check out our FAQs, send us an email or call us at 1 (800) 555-5555
Customer name the price custom described projects are accepted on a fairly price based offer and skill level requests. We will let you know if there are any discrepancies after submitting your project within 24 hours.
Remodeling products - How it works :
All Products Include the product, taxes, delivery to your home and proffesional installation.
We have compared and picked a limited number of the "Best Budget" and "Best Overall" mainstream products so you don't have to shift through a myriad of products and try deciding what's best, select a product that best fit your need and a rep will consult with you on all other product options before we proceed finalizing your work order.
Features
Customer to supply:
Custome saves money by supplying as many materials, parts and fixtures as possible for the project per the
"Customer to supply" list above. Some additional technical materials may also be needed for your project that
we might need to supply. If needed, these materials are charged as follows: store bought materials are charged
based on store receipt plus 20% mark up and, depending on distance, a delivery charge. Truck stock items are
charged a 20% mark up with no delivery charge.
Technical Materials:
Some minor technical materials may also be needed for your project that we might need to supply. If needed, these materials are charged as follows:
store bought materials are charged base on store receipt plus 20% mark up and, depending on distance, a delivery charge. Truck stock items are charged
a 20% mark up with no delivery charge.